首页 > 外语类考试> 大学英语四级
题目内容 (请给出正确答案)
[主观题]

The construction of massive dams and irrigation projects do more good than harm.A.YB.NC.NG

The construction of massive dams and irrigation projects do more good than harm.

A.Y

B.N

C.NG

查看答案
答案
收藏
如果结果不匹配,请 联系老师 获取答案
您可能会需要:
您的账号:,可能还需要:
您的账号:
发送账号密码至手机
发送
安装优题宝APP,拍照搜题省时又省心!
更多“The construction of massive da…”相关的问题
第1题
If the distribution of a construction is functionally equivalent to that of one or more of
its constituents, the construction is called ______.

A.exocentric construction

B.endocentric construction

C.immediate construction

D.contributive construction

点击查看答案
第2题
For structuralists, ______is one whose distribution is functionally equivalent to that of
one or more of its constituents.

A.coordinate construction

B.subordinate construction

C.endocentric construction

D.exocentric construction

点击查看答案
第3题
The construction of the railway is said to have been terminated.A.resumedB.put an end toC.

The construction of the railway is said to have been terminated.

A.resumed

B.put an end to

C.suspended

D.re-scheduled

点击查看答案
第4题
A.structureB.constructionC.formationD.composition

A.structure

B.construction

C.formation

D.composition

点击查看答案
第5题
...contributed to the erosion of black families...()

A.corrosion

B.wear

C.construction

D.lung

点击查看答案
第6题
Virginia owns a business that rents power equipment to construction companies.Despite
点击查看答案
第7题
The decline in high-rise construction mainly results from ______ and______ .

The decline in high-rise construction mainly results from ______ and ______ .

点击查看答案
第8题
The construction of the new library will be completed ____________ (提前).

The construction of the new library will be completed ____________ (提前).

点击查看答案
第9题
What caused the delay in construction?A.The design of the building was unusual.B.The archi

What caused the delay in construction?

A.The design of the building was unusual.

B.The architect delayed construction.

C.The construction crew caused the delay.

D.The weather was extremely cold.

点击查看答案
第10题
The building under _____for stay-at-home children will be completed in March.

A.contribution

B.construction

C.coincidence

D.composition

点击查看答案
退出 登录/注册
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改