首页 > 外语类考试> 大学英语四级
题目内容 (请给出正确答案)
[主观题]

A.To install a microelectronic wave detector.B.To raise the alarm.C.To install cell pho

A.To install a microelectronic wave detector.

B.To raise the alarm.

C.To install cell phone signal shielding facilities.

D.To ask students to switch off the handsets.

查看答案
答案
收藏
如果结果不匹配,请 联系老师 获取答案
您可能会需要:
您的账号:,可能还需要:
您的账号:
发送账号密码至手机
发送
安装优题宝APP,拍照搜题省时又省心!
更多“A.To install a microelectronic…”相关的问题
第1题
Why did Ms. Baker propose to hire a consultant?A.To install a new computer software progra

Why did Ms. Baker propose to hire a consultant?

A.To install a new computer software program

B.To increase the number of new Web site visitors

C.To develop an online report system

D.To review customer complaints

点击查看答案
第2题
Why does Mr. Garrison request a change?A.To install a database program earlier than other

Why does Mr. Garrison request a change?

A.To install a database program earlier than other departments

B.To change the meeting schedule with JTB Finance Co.

C.To give his staff time to work on an important project

D.To enable his staff to take a day off

点击查看答案
第3题
What would the company do with the customers complaint?A.To compensate the man for problem

What would the company do with the customers complaint?

A.To compensate the man for problems.

B.To replace several computer components.

C.To check the settings and get it repaired.

D.To install the software pre-loaded again.

点击查看答案
第4题
What is a stated goal of Mr. Stevenson?A.To purchase upgraded thermostatsB.To replace all

What is a stated goal of Mr. Stevenson?

A.To purchase upgraded thermostats

B.To replace all defective furnace systems

C.To install energy saving lighting fixtures

D.To meet with residents within the next two months

点击查看答案
第5题
Road Construction Notice for Kerry Wood DriveConstruction on Kerry Wood Drive between Tayl

Road Construction Notice for Kerry Wood Drive

Construction on Kerry Wood Drive between Taylor Drive and 58A Street will result in a combination of road closures and local detours over the next few weeks.

The road closure is required to allow contractors to install underground services, the reconstruction of the 55, 56 and 57 Street intersections and the installation of traffic relieving features oh Kerry Wood Drive.

Construction begins today, September 20, and is expected to be complete by October 22. Motorists are advised to use alternate routes to get to their destinations.

We thank you for your patience and cooperation.

For more information, please contact:

The City of North Dom

Engineering Services Department

(403)342-8158

Why is the road closure needed?

A.To install traffic relieving features.

B.To pave Kerry Wood Drive.

C.To install traffic signals.

D.To install detour signs.

点击查看答案
第6题
To: Mark Hopkins<hopkinsm@mgc.com> From: George Wallace<gwallace@solarsys.com&g
To: Mark Hopkins<hopkinsm@mgc.com> From: George Wallace<gwallace@solarsys.com> Subject: March 10 Installation Date: March 1 Dear Mr. Hopkins, As we discussed earlier, I know how important it is for an assembly line to have a power source it can trust. I am sure you will find that our solar backup system is as reliable as conventional backup batteries, in addition to being more cost-effective and requiring very little maintenance. Since we will install the system outside work hours, it will not affect your schedule or cause inconvenience for your workers. If you have any questions before the installation on Saturday, do not hesitate to ask questions. Otherwise, I will see you then. Yours sincerely, George Wallace Sales Director To: George Wallace<gwallace@solarsys.com> From: Mark Hopkins<hopkinsm@mgc.com> Date: March 2 Dear Mr. Wallace, Thank you for your e-mail. I regret to say that we have to postpone the installation of the solar backup system. When I met you last week, I totally forgot we have an annual safety inspection by the Wellington City Fire Department on the same day we are planning to install the solar backup system. Id like to install the system on March 15 instead. I apologize for the inconvenience this may cause. Please let me know whether the date is convenient for you. Thank you. Mark Hopkins Floor Manager Micro Goods Company

For what type of business does Mr. Wallace most likely work?

A.A maintenance service

B.An energy company

C.A fire equipment manufacturer

D.An internet service provider

点击查看答案
第7题
听力原文:W: Hi, Mike. This is Sally Harris from Four Seasons Heating. I'm calling to let y
ou know that the part you have been waiting for is in. Should I send someone over today to install it?

M: Absolutely. We've been freezing here without using the heating system over the weekend. I never realized that our heating system would break down during the coldest month of the year.

W: This kind of problem happens a lot. I think I can have one of our staff over there by noon. He will call from his mobile phone when he' s on his way.

M: Thanks a lot. It will be much warmer tonight.

What is the purpose of Sally' s call?

A.To inform. a customer about a new cooling system

B.To inform. a customer that a component has been delivered

C.To inform. a customer about a hot product

D.To inform. a customer about the sales figures

点击查看答案
第8题
Announcement Forest apartment June 5 RE: New Director We have been looking for our new
director in the last 3 months. After an extensive search, we finally found the right person who will be succeeding the former director, Tony Adams. Nicole Sanders, the new director of the community life of Forest, brings twenty years of experience. Nicole Sanders was formerly the director of the Trinity Housing Complex and the student advisor of Bransford University where she received a degree in marketing. If you need her help, please drop by Apartment 15 before June 30, and she will move into Apartment 8. As requested, the auditorium for residents will be equipped with new air conditioning systems and ventilation systems. We will install light fixtures to improve lighting at Temple Lounge. In the back of Temple Lounge, an enclosed and designated play area will be prepared for young children.

What is the purpose of the information?

A.To advertise an opening position

B.To notify residents of building a new auditorium

C.To provide information to the residents

D.To raise some money for renovation

点击查看答案
退出 登录/注册
发送账号至手机
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改